Featured Projects
All Projects
Status: in progress. Client: Unita. Location: Brunswick Street, New Farm QLD, an old single storey corner shop being rebuilt inside its original walls. Scope: strip out, commercial demolition and excavation,
April to June 2026. Location: Clydesdale Estate, Marsden Park NSW. Client: Gartner Rose. Scope: lead dust removal from ceiling spaces, lead paint removal, asbestos removal, then demolition of old sheds,
Staged works, April to August 2026. Location: an industrial warehouse and storage yard at Seven Hills NSW. Scope: staged saw cutting, breaking out and removal of a large reinforced concrete
Status: complete. Client: Joss Facility Management. Location: a multi storey government office building on Auburn Street, Goulburn NSW. Scope: strip out of the amenities blocks on the lower ground, ground,
Status: complete. Client: JMC Builders. Location: a landmark high rise apartment tower in Darlinghurst NSW. Scope: two full apartment strip outs back to slab, blockwork and soffit ahead of new
Status: complete. Client: CIP Constructions. Location: 18 Forrester Street, Kingsgrove NSW, a light industrial site with a warehouse and distribution facility still trading. Scope: demolition and clearance of the rear
Status: complete. Client: James Clifford Construction. Location: a large registered club at Leumeah NSW, trading throughout. Scope: strip out of five toilet blocks and an ATM alcove ahead of a
Status: complete. Client: Meridian Construction Services. Location: retirement living site, Taren Point NSW. Scope: two packages. Hazardous material removal and strip out of a heritage Nissen hut standing on a
Status: complete. Client: Buildcorp Group, through Buildcorp Asset Solutions. Location: industrial unit, Rydalmere NSW. Scope: strip out and demolition of a fire damaged warehouse and office unit, including the full
Status: completed June 2026. Client: Tier 1 fitout builder, working for the hotel operator (confidential). Location: waterfront hotel, Surfers Paradise QLD. Scope: demolition of the outdoor pool and spa, the
Status: completed July 2026. Client: Lords Group Commercial NSW Pty Ltd. Location: 1a Lyons Road, Drummoyne. Scope: staged strip out of two multi storey buildings on a former aged care
Status: completed October 2024. Client: Tier 1 client (confidential). Location: Broadway, Sydney. Scope: internal demolition of a four level heritage building behind its retained brick facade, then excavation of a
Status: completed May 2025. Client: Venari Projects Commercial. Location: 396 George Street, Sydney CBD. Scope: soft strip, structural demolition, bulk and detailed excavation, and engineered underpinning inside a heritage building
Status: in progress, started June 2026. Client: Hurst Concepts Australia. Location: 598-610 Crown Street, Surry Hills NSW. Scope: hazardous materials removal, soft strip of the shops, hand demolition of the
Status: finishing, September 2026. Client: Horizon Habitats. Location: 25 Nobbs Street, Surry Hills NSW. Scope: decontamination, detailed demolition of ten terrace houses behind their retained front walls, excavation and contaminated
A residential complex in Beaconsfield needed a package of remediation and building work across several areas at once: upper level facade access, water damaged units inside, and a rooftop terrace
A high-end residential property in Palm Beach needed structural strengthening and concrete repairs across several elements, with finishes that could not be marked and neighbours who could not be disturbed.
A private home in Kingsford had concrete cancer through the balcony soffit and no drawings to say what the slab could carry. Perfect Group was engaged to take the balcony
Status: in progress. Client: RJA, Retail Joinery Australasia. Location: 141-147 King Street, Sydney CBD NSW 2000. Scope: retail strip out, internal and structural demolition, and detailed excavation to form new
Perfect Strip Out & Demolition has an extensive and diverse range of projects under our belt, with experience in a number of industries, sectors and conditions. Read above to see some of our case studies, demonstrating our proficiency and expertise in dealing with various projects.
The Perfect Strip Out & Demolition team is perfect for a range of projects, with experience in industrial, commercial and residential projects. To deal with the experts who understand how to perform the job right, every time, contact Perfect Strip Out & Demolition today.
See Perfect Strip Out & Demolition solutions to a multitude of issues. No matter your project size, you can always expect fast, effective and friendly service in every operation. We have experience dealing with a number of stakeholders, from local councils to state and federal governments.

Perfect Stripout & Demolition acknowledges the Aboriginal and Torres Strait Islander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.