Hundreds of safe, completed demolition projects, and our own plant to do them with.
Detailed and structural demolition for commercial, industrial and residential clients, working Sydney and greater NSW, Brisbane and South East Queensland, and along the East Coast.
Machines from 0.8 tonne up to 35 tonne, Brokk remote demolition machines, our own tippers, hook trucks and skips, and the licences to deal with whatever is in the building.
We are the lighter and more detailed half of the group. Heavy structural demolition and major civil goes to Perfect Contracting. If your job is bigger than us we will tell you and hand you across rather than stretch.
Services
Detailed Demolition
Careful, selective removal where the surrounding structure or finishes have to survive intact.
Structural Demolition
Load bearing elements removed to an engineered sequence, with propping designed before anything moves.
Internal Demolition
Walls, slabs, stairs and cores taken out inside a building that is staying up around the work.
Tight Access Demolition
Small machines, hand work and remote plant where a conventional excavator will never fit.
Heritage Demolition
Selective removal beside fabric that has to be protected, usually under a heritage condition of consent.
Remote Demolition
Brokk machines for hot, unstable or confined work where we would rather not put a person.
Experience
Since 2010 we have completed hundreds of demolition projects across Sydney, Brisbane and the East Coast, from single rooms to whole buildings.
Backed by a team of skilled estimators, project managers, site managers and tradesmen, our team are reliable, highly qualified professionals who work hard to deliver truly exceptional service and quality projects for our clients.
With a long history of innovation, the Perfect team is dedicated to the delivery of world-class client outcomes. We foster an energetic culture that encourages dynamic thinking and the use of technology to achieve intelligent solutions. This progressive environment makes conditions safer, more sustainable and have the utmost efficiency.

Approach
Safety
Safety is at the forefront of our operations across Australia, demonstrated by our Occupational Health and Safety Management Systems being certified to AS/NZS 4801:2001, our exemplary safety record and comprehensive internal structures and processes. We encourage open communication with the aim of creating greater awareness to help reduce injuries and improve our safety performance. We recognise that the involvement of managers in the safety management process is critical, particularly at the site manager and supervisor level.
Strong Team
We understand the risks and challenges that project managers face every day, which is why we are committed to providing a responsible and flexible workforce equipped to deliver quality outcomes on commercially sensitive projects. Our employees are honest and punctual, carefully selected to represent the Perfect Strip Out & Demolition culture. We're a tight-knit team and believe a respectful and supportive onsite environment is critical to cooperation, problem solving and time management.
Technical Expertise
Since the company was established in 2010, we have grown quickly, delivering on significant flagship projects including Town Hall Train Station, Circular Quay Train Station and Sydney International Airport. Backed by a team of skilled estimators, project managers, site managers and tradesmen, our team are reliable, highly qualified professionals who work hard to deliver truly exceptional service and quality projects for our clients.
Fleet
Perfect operates its own fleet of heavy-duty state-of-the-art machinery ranging from nimble 0.8t excavators to large positracks to 35t excavators.
Additionally we operate an armada of hook trucks and skips, tippers, EWP's, forklifts, Brokks, lifts, scaffolding and almost every tool known to man.With our continued investment in emerging technologies, safety and innovation, Perfect's service scope ranges from the simple & straightforward to the thoroughly technical to the downright demanding.

People
The key to Perfect's continual success is down to one key factor, Our People.
Our crews are the ones out there doing the hard graft every single day, ensuring your project gets delivered on time, every time. Because that's what we do. We get it done.
From management and operations to engineering and estimating to supervisors and ground workers, Perfect Strip Out & Demolition hires only the best. Continual improvement processes ensure regular training, new tickets and upskilling.
Projects
Status: in progress. Client: Unita. Location: Brunswick Street, New Farm QLD, an old single storey corner shop being rebuilt inside its original walls. Scope: strip out, commercial demolition and excavation,
April to June 2026. Location: Clydesdale Estate, Marsden Park NSW. Client: Gartner Rose. Scope: lead dust removal from ceiling spaces, lead paint removal, asbestos removal, then demolition of old sheds,
Staged works, April to August 2026. Location: an industrial warehouse and storage yard at Seven Hills NSW. Scope: staged saw cutting, breaking out and removal of a large reinforced concrete
Status: complete. Client: Joss Facility Management. Location: a multi storey government office building on Auburn Street, Goulburn NSW. Scope: strip out of the amenities blocks on the lower ground, ground,
Status: complete. Client: JMC Builders. Location: a landmark high rise apartment tower in Darlinghurst NSW. Scope: two full apartment strip outs back to slab, blockwork and soffit ahead of new
Status: complete. Client: CIP Constructions. Location: 18 Forrester Street, Kingsgrove NSW, a light industrial site with a warehouse and distribution facility still trading. Scope: demolition and clearance of the rear
Detailed demolition, and why it costs what it costs
Detailed demolition is removing one part of a structure while everything around it stays exactly as it is. A slab out of a floor plate, a stair core out of a building, a wall out of a party wall situation.
It is slow by design. You saw cut rather than break where the edge matters, you work in small pieces so nothing drops uncontrolled, and you prop before you cut rather than after. Anyone quoting it at bulk demolition rates has not understood the job.
Where the cut needs to be clean, Perfect Concrete Care does the sawing. Same group, so it is a phone call and not a subcontract.
Before anything comes down
Approvals. Most demolition needs consent, and a lot of it needs a demolition management plan, traffic control and neighbour notification. We will tell you plainly what your job needs.
Hazmat survey. Anything pre 1990 gets surveyed. Asbestos, lead paint, SMF, PCBs in old light fittings. Better to find it on paper than with an excavator.
Services. Disconnected and capped, with the paperwork from the authority. This is the single most common cause of a job sitting idle.
Propping. If anything is staying, the temporary works design comes first. We install propping ourselves, so it is one contractor for both.
What happens to the material
We recycle most of what we take out. Concrete and brick to crushing, steel to the scrap merchant, clean timber separated, and only the genuine residual going to landfill.
Sorting on site costs a bit of time and saves a lot of tipping. On a job with any volume it is usually the difference between a good price and an expensive one, and you get the dockets either way.
We run our own tippers, hook trucks and skips, so the demolition is never waiting on somebody else's truck booking.
Where we work
Sydney and greater NSW from Marrickville, Brisbane and South East Queensland from Slacks Creek, and up and down the East Coast for the right job. Regional work is normal for us, not an exception.
Sydney 02 7908 4944. Brisbane and South East Queensland 07 2145 6581.
FAQs
Do I need approval before you demolish?
Almost always. Most demolition needs development consent or a complying development certificate, and a lot of it needs a demolition management plan as well. Tell us the address and what you want gone and we will tell you what you need.
How long does a house demolition take?
On a straightforward detached house with clear access, usually two to five days on site once services are disconnected and approvals are in. Hazardous material, tight access or a heritage condition will add to that.
What if there is asbestos?
We survey first on anything old enough to have it, and we remove it ourselves under our own licences, including friable. You get the clearance certificate and the disposal dockets.
Can you demolish part of a building and keep the rest?
Yes, that is a lot of what we do. It needs an engineered propping design first, which we install as well. Have a look at our structural propping and half house demolition pages.
Should I just take the cheapest quote?
Look at what is in it before you do. The cheap numbers usually exclude the hazmat, the disconnections, the traffic control and the disposal, and those come back as variations. Ask every contractor for the exclusions, not just the price.
Request a Quote
Enter your phone number and we'll call you back within 30 min!
Check Our Other Services
Related services
- Underpinning, Sydney footing support before excavation
- Swimming pool removal, Sydney

Perfect Stripout & Demolition acknowledges the Aboriginal and Torres Strait Islander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.