Houses and dwellings projects lie at the heart of Perfect’s roots.
Often the single largest financial and emotional investment the average Australian will make, houses and dwellings strip outs and demolition calls for gentler hands. Whether small scale such as bathroom removals or larger scale like half house demolition, Perfect Strip Out & Demolition are Sydney’s premiere houses and dwellings deconstruction contractor.
For us, thirteen is a lucky number. It’s the number of years our houses and dwellings demolition resume harks back. We’re fortunate to have been completing light houses and dwellings demolition works almost every day since our 2009 inception. Those dozen years has solidified our processes into a safe, efficient operation that can be mobilised quickly and cost-effectively. Our services range from strip outs to detailed demolition; small structural and half house deconstruction; tight access, heritage and small civil works.

Services
Demolition
Perfect Strip Out & Demolition provides comprehensive detailed demolition services all over Sydney and greater NSW.
Houses & Dwellings Stripout
Perfect Strip Out & Demolition have years of experience in carrying out houses and dwellings strip out projects all across the Sydney.
Half House Demolition
Perfect has extensive experience when it comes to carrying out concrete penetrations in the houses and dwellings sector.
Rubbish Removal
Perfect Strip Out & Demolition provide comprehensive rubbish removal services for the houses and dwellings and commercial sectors.
Skip Bin Hire
Perfect Strip Out & Demolition have a large variety of Skip Bins available for hire all over Sydney.
Labour with Tools
Perfect Strip Out & Demolition offers a motivated and skilled workforce for hire in Sydney.
Featured projects
Cremorne
Client: Built By Dezign
Perfect have recently completed half house demolition works for our client Built by Dezign at a house project in Cremorne.
The scope of works for this project involved:
- Allow for removal of Brick Walls
- Allow for removal of Timber Floors
- Allow for removal of underlying concrete slab assuming 100mm thick
- Allow demolishing existing garage
- Allow to level garden bed in front of the house – 25m2 & 100mm deep.

Longueville
Client: FS Hough
Perfect was contracted by FS Hough for the demolition of residential a building, this project had very tight access excavation and all works were completed using a crane.
Our Brokk110 was used for the excavation works. Excavation works included the demolition and disposal of timber framed metal carport roof, carport slab 200mm depth, masonry support columns, tiled roof, concrete stair case, external brick walls and bay windows.
Demolition of existing concrete pool, penetrations through pool, drilling of piles for the building extension and removal of a lift shaft. There was some excavation completed with the Brokk200 through hard sandstone 4 meters deep into the lift shaft. Hand demolition completed for the top floor and retaining of all the timber floors below. Works were completed in 10 working weeks with various hand power tools as well as with our Brokks and demolition saws.
- Tiled Roof Removal
- Concrete Slab Penetrations
- Concrete Stair Case Removal
- External Brick Wall Removal
- Car Port Slab Removal.

Experience
Perfect is one of the most experienced demolition contractors in Sydney when it comes to houses and dwellings demolition.
We have done it all, soft strip outs, back to base strip outs, half house demos, trenching, small civil works. It doesn’t matter if its twenty stories or single. Perfect have developed our processes and constantly innovated to become more and more efficient at all aspects of houses and dwellings demolition.
Regardless of the scope, scale or stipulations – Perfect Strip Out & Demolition’s major strength lies in fast, safe and efficient operation. With roots deep in the houses and dwellings sector, we can hand over your project on time and within budget regardless if its soft strip-out works or complex structural demolition. From permits to service disconnection and waste disposal, Perfect’s project management team offers the personalised touch that ensures your civil project is delivered to spec.


People
The key to Perfect’s continual success is down to one key factor, Our People.
Our crews are the ones out there doing the hard graft every single day, ensuring your project gets delivered on time, every time. Because that’s what we do. We get it done.
From management and operations to engineering and estimating to supervisors and ground workers – Perfect Strip Out & Demolition hires only the best. Continual improvement processes ensure regular training, new tickets and upskilling.
Fleet
Perfect operates its own fleet of heavy-duty state-of-the-art machinery ranging from nimble 0.8t excavators to large positracks to 35t excavators.
Additionally we operate an armada of hook trucks and skips, tippers, EWP’s, forklifts, Brokks, lifts, scaffolding and almost every tool known to man.
With our continued investment in emerging technologies, safety and innovation, Perfect’s service scope ranges from the simple & straightforward to the thoroughly technical to the downright demanding.


Perfect Stripout & Demolition acknowledges the Aboriginal and Torres Strait Islander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.