2 Level Office Strip-out, North Ryde Sydney

2 Level Office Strip-out North Ryde Sydney

Project Details

Location

North Ryde, NSW

Client

Intrec Management Pty Ltd

Duration

October 2016

Perfect recently finished the strip-out of two office levels for Intrec Management PTY Ltd in North Ryde. All waste was separated and removed from site for recycling. Perfect aim to recycle 100% of waste removed from sites.

Scope of work included:

  • Remove existing Carpet
  • Remove Carpet Tiles
  • Strip-out Male & Female Toilets
  • Remove Doors, Toilet Fixtures & Partitions
  • Remove workstations
  • Remove Reception Desk

Our team members recently completed works at 1 Lucknow St, North Ryde. This included the office strip-out of a two level office building. First off we stripped out all workstations on both floors. This give us easier access to the carpet tiles on each floor. Then we proceeded to remove all carpet / carpet tiles from both levels. Our team members also removed all gyprock partitions on both levels.

All waste and rubbish was loaded into our Tub Bins and removed from site by out Tipper Trucks. This made the removal from site fast and efficient and cut down on double handling materials.

Also part of the scope of work was to remove the (3.5m x 1m) reception desk on the ground level while keeping the existing flooring and floor matt intact. Our team members ensured the up most care was taken when removing this reception desk to ensure no damage was done to the existing floor.

Our Supervisor on site Moustapha Merhi ensured that all our team members wore full Personal Protective Equipment at all times to ensure their safety.

See below tabled summary of waste material loaded out from the project.

Waste TypeWeight in kg’sWeight in tons
Steel8,000kg8t
General light mixed waste36,000kg36t
TOTAL44,000kg44t

GET A FREE QUOTE TODAY!

PERFECT REMEDIATION is capable of carrying out project like

2 Level Office Strip-out, North Ryde Sydney

with a quick turn around, give us a call today on (02) 7912 3054Whether you’re undertaking a residential or commercial construction project, we have everything you need to ensure the job is completed on time and to budget.

Talk to a real personCall now

Aboriginal and Torres Strait Islander flagsPerfect Stripout & Demolition acknowledges the Aboriginal and Torres Strait Islander people as Traditional Custodians of the country on which we live and work. We pay our respects to the Traditional Custodians and Elders past, present and future, and honour their connection to the land and ongoing contribution to society.