Half House Demolition and Structural Propping on the Gold Coast
Gold Coast half house demolition: Propped to your engineer's design before anything is removed
- Propped to your engineer's design before anything is removed
- Hand and small plant demolition beside the part that stays
- Retained half sealed and weatherproof between stages
- Detailed excavation for the new footings with the same crew
For architects, builders and owners on the Gold Coast keeping part of a good home and rebuilding the rest. We prop what stays to your engineer's design, take down what goes, and hand back a level, weatherproof site.
Or call 07 2145 6581Send us the Gold Coast plans
What stays, what goes, and our Queensland team will be in touch.
Keep the front, take the back on the Gold Coast
Most of our residential work on the Gold Coast is on good homes where part of the building stays. Keep the front and take the back for an extension. Keep the ground floor and take the top for a new upper level. Remove a wing, a garage or an old extension. Take out a load bearing wall and carry the load on temporary works while the new beam goes in. Separate a semi or a terrace without disturbing the party wall. Hold a heritage facade while everything behind it comes down.
The part that stays is the hard part. It has lost bracing and often a roof line, so it is supported before the first brick moves and kept dry while the new work goes up.
The houses we are asked about on the Gold Coast are older beach houses in Mermaid Beach, Palm Beach, Currumbin, Tugun and Coolangatta, canal front homes in Broadbeach Waters, Isle of Capri, Sorrento, Paradise Waters and Sovereign Islands where the rear is rebuilt to the water, Queenslanders in the older parts of Southport and Nerang, post-war brick in Labrador and Miami, and hinterland acreage at Tamborine Mountain, Mudgeeraba, Currumbin Valley and Tallebudgera Valley.
Not a knockdown service
We will say this plainly. If you are clearing a whole house to rebuild from scratch, we are not the one to call. There are cheaper operators with one excavator and one truck who do simple full house demolitions all day, and they will beat our price every time. We do not chase that work.
We come in when part of the building has to stay standing, be propped, and be handed back level and weatherproof. That is slower, more careful work. You saw cut rather than break, work in small pieces, and prop before you cut. Anyone pricing it at bulk demolition rates has not understood the job.
Heavy structural demolition and major civil work goes to Perfect Contracting within the group.
Propping to your engineer's design
Propping is temporary works, and temporary works get designed. Your structural engineer specifies what goes where, what it carries, and in what order it goes in and comes out. We install to that design and do not improvise on site. We never design the propping ourselves, and the engineer, not us, certifies it. If you do not have a design yet we will say so before we quote, and we can point you at engineers we work with.
What goes in depends on the design: steel props, needles and strongbacks, universal beams, raking and flying shores on party walls. Where it matters the props are inspected and signed off before demolition starts. They stay until the permanent structure has gained strength and come out in the order the engineer specifies. More on our structural propping page.
How a half house job runs
- Plans in. Demolition plan, temporary works design if it exists, photos.
- Before anything comes down. Approvals, hazardous material survey on older homes, services isolated and capped. Asbestos found is removed under our own licences.
- Neighbours. Dilapidation report on the retained structure and adjoining homes, party wall notice where required.
- Propping. Installed to the engineer's design before anything is removed.
- Saw cut. A clean cut at the junction between what stays and what goes, not a torn edge.
- Demolition. In the order the design allows. Hand work and small plant beside what stays, a remote demolition machine such as a Brokk where access is tight, plant craned in when there is no other way.
- Weatherproof. Temporary roofing, wrapping and hoarding on the exposed face.
- Excavation. Slab out, then detailed excavation to the engineer's set out for the new footings.
- Waste. Concrete and brick to crushing, steel to scrap, timber separated, all classified, removed and transported with dockets.
- Strike. Props out in the specified order once the new structure is doing its job.
Dust and noise are controlled and kept to approved hours, trucks stay off the street at school times, and the road is washed. The Gold Coast is under an hour down the M1 from Slacks Creek. Canal blocks have their own problems. The rear boundary is a revetment wall and the neighbours are close, so plant comes in through the front and rubble leaves the same way in small loads. Beach houses on the coast strip sit on sand, and the engineer will have a view on how the retained half is held while footings go in. The hinterland has room to work but long drives and soft ground after rain.
Jobs we can show you
The jobs we can show you are in Sydney, where our residential half house work has been so far. Our Queensland crew works to the same method, and we give references on request.
In Cremorne we did a half house demolition for Built by Dezign: brick walls, timber floors, slab and garage out, brick recycled. In Longueville, for FS Hough, the top floor of a harbourside home came off by hand with the timber floors below retained, and the plant was craned in. In Woolloomooloo the rear of a heritage listed terrace was removed and the walls braced and propped for a rear extension. In Lavender Bay a concrete garage came out with a remote demolition machine.
Within Perfect Group, Perfect Contracting kept the entire facade of a heritage listed harbourside villa in Kirribilli while the interior was demolished, and tunnelled under an occupied harbourside house in Mosman. Those are group jobs rather than ours.
On most of these jobs we stay on for the detailed excavation, so one contractor is responsible from the first prop to the last truckload.
Planning an extension or second storey on the Gold Coast?
Send us the plans and the engineer's details, and tell us what stays and what goes. Call 07 2145 6581 or use the form above.
We also do this work in Sydney, Wollongong, Newcastle, Brisbane and Sunshine Coast. See half house demolition, partial demolition and propping, commercial strip out on the Gold Coast, or all Perfect Strip Out services.